• image
  • image
Visible Vault Progress PDF Print E-mail

The first of the two construction projects will be the transformation of an old warehouse on N. 26th Street into the first publicly accessible art storage facility and museum interpretive center in the region.
This section is updated regularly.

Week of  March 15, 2010
Rack-system-2.20100305
Rack-system-2.20100305
Rack-system-4.20100305
Racking-system-1.20100311
Racking-system-2.20100311
Racking-system-3.20100311
Stainless-countertop.20100305
Up-on-mezzanine-1.20100311
Week of February 22, 2010
Carving-in-the-river-1.20100225
Carving-in-the-river-1.20100225
Carving-in-the-river-2.20100225
Exterior-metal-siding.20100225
Glass-entry-doors-in.20100225
Mezzanine-installation.20100225
Restroom-installation.20100225
Sinks-waiting-to-go-in.20100225
SW-corner-of-exterior.20100225
Tiling-the-restrooms.20100225
Week of February 15, 2010
Chalking-in-the-river.20100218
Chalking-in-the-river.20100218
Exterior-full-view.20100218
Interior,-toward-NW.20100218
Interior-wall-patching.20100218
Mezzanine-frames.20100218
Mezzanine-going-in.20100218
Roll-up-door.20100218
Vent,-inner-lift-area.20100218
Week of November 23, 2009
On-the-observation-deck
On-the-observation-deck
Painting-the-building
Planting-beds
Planting-beds-Side
Plywood-supplies
Recycled-rubber-bumpers
Studio
Week of October 26, 2009
VV-exterior-paint-tests.20091030
VV-exterior-paint-tests.20091030
VV-looking-into-loading-area.20091030
VV-office-areas-1.20091030
VV-office-areas-2.20091030
VV-sheetrocking-start.20091030
VV-south-side.20091030
VV-studio-to-left.20091030
VV-toward-loading-dock.20091030
VV-vestibule,-2nd-day-1.20091030
VV-vestibule,-2nd-day-2.20091030
VV-vestibule.20091030
Week of September 28, 2009
VV,-ceiling-and-new-piping.20090924
VV,-ceiling-and-new-piping.20090924
VV,-framing,-toward-loading-dock.20090924
VV,-framing-for-walk.20090928
VV,-framing-up-loading-areas.20090924
VV,-framing.20090924
VV,-interior-framing-1.20090928
VV,-interior-framing-2.20090928
VV,-interior-framing-3.20090928
VV,-new-concrete-for-cold-storage-shed.20090924
VV,-new-concrete.20090924
VV,-new-sidewalk.20090928
VV,-ready-for-paving.20090928
VV-1.20090924
VV-2.20090824
VV-3.20090924
Week of September 21, 2009
VV,-loading-area.20090917
VV,-loading-area.20090917
VV,-walls-marked-out-1.20090917
VV,-walls-marked-out-2.20090917
VV,-walls-marked-out-3.20090917
VV,-well-drilling,20090915
VV,-well-drilling-1.20090915
VV,-well-drilling-1.20090917
VV,-well-drilling-2.20090915
VV,-well-drilling-2.20090917
VV,-well-drilling-3.20090917
VV.20090915
Week of September 17, 2009
Boom-truck-2.20090818
Boom-truck-2.20090818
Boom-truck.20090818
Enclosing-alcove.20090818
Footings-for-new-entry.20090818
New-entry-framing.20090818
Pouring-footings-3.20090814
Ready-for-footings.20090814
Rooms-removed.20090811
Salvaged-fiberglass-insulation
Salvaged-wood
South-rollup-door-removal-2.20090811
South-rollup-door-removal.20090811
VV-1.20090810
VV-2.20090810
VV-3.20090810
VV-4.20090810
VV-5.20090810
VV-6.20090810
 
<<  Feb 2012  >>
 Sun  Mon  Tue  Wed  Thu  Fri  Sat 
     1  2  3  4
  5  6  7  8  91011
12131415161718
19202122232425
26272829   

Announcements

Adult Education Programs
Dig into our winter programs!
Click here

 


MAC-Logo

IMLS_Logo_2c